Baqer cement plant expansion project in Yemen

Date :2019-03-07 Hits:56
text:bigmiddlesmall
Existing problems:
- System voltage fluctuation caused by a large number of wind turbines and other large power loads;
- Current distortion, transformer heating, and increase of line loss caused by nonlinear load;

- Low power factor and serious voltage drop.


Solution:

TBB high voltage reactive power centralized compensation of SSE was used for power quality optimization.


Control effect:
The power factor was increased from 0.75 to over 0.96; the 7thand 5th harmonics were suppressed effectively, and the line loss was reduced.